|
Run Card for cmos150 |
|
Step 15.0 |
|
|
|
|
|
Process:N-Well
Field Implant Photo:Mask NWELL (CWN
chrome-df)
|
Date |
Operator |
|
|
|
|
|
Standard I-line Process |
|
|
|
|
|
|
1.
|
HMDS
|
11/08/01
|
vorosl, jcpeng
|
|
Program: 1 on svgcoat6
|
|
|
|
|
|
|
2.
|
Spin and Soft Bake
|
11/08/01
|
vorosl, jcpeng
|
|
Program: 7 and 1 on svgcoat6
|
|
|
|
photoresist: UV26-1.5 (Shipley)
|
|
|
|
Thickness of PR= 14000 Å
|
|
|
|
3000 RPM
|
|
|
|
Soft Bake: 60 sec at 130C
|
|
|
|
|
|
|
3.
|
Expose by ASML
|
11/08/01
|
vorosl
|
|
Alignment marks were cleared 80 mJ/cm2
(baseline-clearout), only developed without PEB.
Job name: baseline, energy of light= 30 mJ/cm2 |
|
|
|
NWELL mask
|
|
|
|
|
|
|
4.
|
Post Exposure Bake (program:1)
|
11/08/01
|
vorosl, jcpeng
|
|
90 sec at 110C
|
|
|
|
|
|
|
5.
|
Develop (program:1)
|
11/08/01
|
vorosl, jcpeng
|
|
|
|
|
6.
|
Inspect
|
11/08/01
|
vorosl
|
|
|
|
|
7.
|
Descum
|
|
|
|
This step was skipped, since there is no 6? tool
for it.
|
|
|
|
|
|
|
8.
|
Hard Bake (more than 2 hours in the oven, 120 C)
|
11/08/01
|
jcpeng
|