Run Card for cmos150

Step 15.0

Process:N-Well Field Implant Photo:Mask NWELL (CWN chrome-df)

Date

Operator

Standard I-line Process

1.
HMDS
11/08/01
vorosl, jcpeng
Program: 1 on svgcoat6
2.
Spin and Soft Bake
11/08/01
vorosl, jcpeng
Program: 7 and 1 on svgcoat6 
photoresist: UV26-1.5 (Shipley)
Thickness of PR= 14000 Å
3000 RPM
Soft Bake: 60 sec at 130C
3.
Expose by ASML
11/08/01
vorosl
Alignment marks were cleared 80 mJ/cm2 (baseline-clearout), only developed without PEB.

Job name: baseline, energy of light= 30 mJ/cm2

NWELL mask 
4.
Post Exposure Bake (program:1)
11/08/01
vorosl, jcpeng
90 sec at 110C
5.
Develop (program:1)
11/08/01
vorosl, jcpeng
6.
Inspect
11/08/01
vorosl
7.
Descum 
This step was skipped, since there is no 6? tool for it.
8.
Hard Bake (more than 2 hours in the oven, 120 C)
11/08/01
jcpeng